City Fire Equipment Company

Presents the

NFPA25 Guidelines*

 

Inspection, Testing & Maintenance of Water Based Fire Protection Systems

 

City Fire Equipment Company is providing these guidelines as a public service to the fire protection community. Our goal is to clarify the inspection testing and maintenance requirements of the State of

New Jersey Uniform Fire Code

State of New Jersey Uniform Fire Code.

(as amended January 2, 1999)

*Section F-506.0 Water-Based Fire Protection Systems: All water sprinkler and water-spray extinguishing systems and standpipe systems shall be periodically inspected, tested and maintained in accordance with the requirements of NFPA25 1998 including Appendix B, NFPA (National Fire Protection Association)

Phone 973-560-1600 Fax 973-781-1099

Page 1

SPRINKLER SYSTEM

INSPECTION

TEST

MAINTENANCE

Gauges (dry)

Weekly/Monthly

Every 5 years

Control Valves

Weekly/Monthly

Annually

Alarm Devices

Quarterly

Quarterly

Gauges (wet)

Monthly

Every 5 Years

Hydraulic nameplate

Quarterly

Buildings

Annually (prior to freezing weather)

Hanger/seismic bracing

Annually

Pipe and fittings

Annually

SPRINKLER HEADS

Extra high temp.

Annually

5 Years

Fast response

Annually

At 20 years and 10 years thereafter

Sprinklers

Annually

At 50 years and 10 years thereafter

Spare sprinklers

Annually

Main Drain

Quarterly

Antifreeze solution

Annually

STANDPIPE AND HOSE SYSTEM

VALVES

     

All types

   

Annually/as needed

Control valves

Weekly/monthly

   

Pressure control valve

 

Every 5 Years

 

Pressure reducing valve

 

Every 5 Years

 

Pressure regulating devices

Quarterly

   

Piping

Quarterly

   

Hose connections

Quarterly

 

Annually

Hose

Annually

   

Hose storage device

 

Annually

 

Hose Nozzle

 

Annually

 

Cabinet

Annually

   

Hydrostatic test

 

5 Years

 

Flow Test

 

5 Years

 

Main drain test

 

Annually

 

FIRE PUMPS

INSPECTION

TEST

MAINTENANCE

Pump house, heating ventilation louvers

Weekly

Fire pump system

Weekly

PUMP OPERATION

No-flow condition

Weekly

Flow condition

Annually

Hydraulic

Annually

Mechanical transmission

Annually

Electrical system

Varies

Controller, various components

Varies

Motor

Annually

Diesel engine system, various components

Varies

Page 2

PRIVATE FIRE SERVICE MAINS

     

Hose houses

Quarterly

 

Annually

Hydrants (dry barrel and wall)

Annually and after each operation

Flow annually

Annually

Monitor nozzles

Semiannually

Flow annually (rang and operation)

Annually

Hydrants (wet barrel)

Annually and after each operation

Flow annually

Annually

Mainline strainers

Annually and after each significant flow

 

Annually and after each operation

Piping (exposed)

Annually

 

5 years

Piping (Underground)

*see note

 

5 years

*The following requirements outline inspection intervals, conditions to be inspected, and corrective actions necessary for private fire service mains and associated equipment. All procedures shall be carried out in accordance with the manufacturer’s instructions, where applicable.

WATER STORAGE TANKS

     

Condition of water in tank

Monthly/quarterly

Water temperature

Daily/weekly

Heating system

Daily/weekly

   

Control valves

Weekly/monthly

 

Annually

Water-level

Monthly/quarterly

 

6-4.1

Air pressure

Monthly/quarterly

   

Tank - exterior

Quarterly

   

Support structure

Quarterly

   

Catwalks and ladders

Quarterly

   

Surrounding area

Quarterly

   

Hoops and grillage

Annually

   

Painted/coated surfaces

Annually

Expansion joints

Annually

   

Interior

5 years/3 years

   

Check Valves

5 Years

9-4.2.2

Temperature alarms

 

Monthly

 

High-temperature limit switches

 

Monthly

 

Water level alarms

 

Semiannually

 

Level indicators

 

5 Years

 

Pressure gauges

 

5 Years

 

Thermostats

   

Manufactures instructions

Drain sediment

   

Semiannually

Cathodic protection

   

Annually

Drain valves cycled

   

Annually

Vent screens

   

Annually

Repainting – steel

   

6-4.16

Embankment-supported coated-fabric

   

6-4.17

6-4.1 The tank shall be maintained full or at the designed water level. The hatch covers in the roofs and the door at the top of the frostproof casing shall always be kept securely fastened with substantial catches as a protection against freezing and windstorm damage.

9-4.2.2 Internal components shall be cleaned, repaired, or replaced as necessary in accordance with the manufacturer’s instructions.

6-4.16 Repainting shall be done only on dry surfaces that are thoroughly cleaned of all base paint, rust, scale, or other surface contamination.

6-4.17 The maintenance of ESCF tanks shall be completed in accordance with this section and the tank manufacturer’s instructions.

 

Page 3

 

WATER SPRAY FIXED SYSTEMS

INSPECTION

OPERATIONAL TEST

MAINTENANCE

Backflow preventer

7-3.8

7-3.8

7-3.8

Check valves

7-3.8

7-3.8

7-3.8

Control valves

Weekly (sealed)

Quarterly

Annually

Control valves

Monthly (locked,supervised)

Quarterly

Annually

Deluge valve

7-3.2

7-3.2.1, 7-3.2.2

7-3.2.1, 7-3.2.2

Detection systems

NFPA 72

NFPA 72

NFPA 72

Detector check valves

7-3.8

7-3.8

7-3.8

Drainage

Quarterly

   

Electric motor

7-3.11

7-3.11

7-3.11

Engine drive

7-3.11

7-3.11

7-3.11

Fire Pump

7-3.11

7-3.11

7-3.11

Fittings

Quarterly

   

Fittings (rubber-gasketed)

Quarterly

   

Gravity tanks

7-3.12

7-3.12

7-3.12

Hangers

Quarterly

   

Heat (deluge valve house)

Daily/weekly

   

Nozzles

Monthly

Annually

 

Pipe

Quarterly

   

Pressure tank

7-3.12

7-3.12

7-3.12

Stream driver

7-3.11

7-3.11

7-3.11

Strainers

Mfg. Instructions

Annually

Annually

Strainers (baskets/screen)

   

5 Years

Suction tanks

7-3.12

7-3.12

7-3.12

Supports

Quarterly

   

Water supply piping

7-3.6.1, 7-3.6.2

   

Water flow alarm

 

Quarterly

 

Water spray system

 

Annually

Annually

Water supply flow test

 

4-3.2

 

Main drain test

 

Quarterly

 

Manual release

 

Annually

 

UHSWSS – detectors

Monthly

   

UHSWSS – controllers

Each shift

   

UHSWSS – valves

Each shift

   

UHSWSS

 

Annually

 

Backflow preventer

   

7-3.8

4-3.2Hydrants shall be tested annually to ensure proper functioning. Each hydrant shall be opened fully and waterflowed until all foreign material has cleared. Flow shall be maintained for not less than one minute.

7-3.2, 7-3.2.1, 7-3.2.2Deluge valves shall be inspected, tested, and maintained in accordance with Chapter 9. Where applicable, the deluge valve enclosure shall be maintained at a minimum of 40 deg. F

7-3.6.1.The dependability of the water supply shall be ensured by regular inspection and maintenance, whether furnished by a municipal source, on-site storage tanks, a fire pump, or private underground piping systems.

7-3.6.2 Water supply piping shall be maintained free of internal obstructions.

7-3.8 Other devices, such as check valves, detector check valves, and backflow preventers, that are installed in the water supply piping system shall be inspected and maintained so that they do not impede the flow of water and fire main pressure see chapter 9 for inspection and maintenance requirements.

7-3.11 See chapter 5

7-3.12 See chapter 6

Page 4

FOAM-WATER SPRINKLER SYSTEMS

Inspection

Test

Maintenance

Discharge device location (sprinkler)

Annually

Annually

 

Discharge device location (spray Nozzle)

Monthly

Annually

 

Discharge device position (sprinkler)

Annually

Annually

 

Discharge device position (spray nozzle)

Monthly

Annually

 

Discharge device obstruction

 

Annually

 

Foam concentrate strainer(s)

Quarterly

Annually

Quarterly

Foam concentrate pump operation

   

Monthly

Foam concentrate samples

   

Annually

Drainage in system area

Quarterly

   

Proportioning systems(s) all

Monthly

Annually

 

Pipe corrosion

Quarterly

   

Pipe damage

Quarterly

   

Fittings corrosion

Quarterly

   

Fittings damage

Quarterly

Hangers/supports

Quarterly

   

Water supply tank(s)

See chapter 6 NFPA 25

See chapter 6 NFPA 25

See chapter 6 NFPA 25

Complete foam-water system(s)

 

Annually

 

Foam-water solution

 

Annually

 

Manual actuation device(s)

 

Annually

 

Backflow preventer(s)

 

Annually

See chapter 9 NFPA 25

Fire pump(s)

See chapter 5 NFPA 25

See chapter 5 NFPA 25

See chapter 5 NFPA 25

Water supply piping

8-2.6.1

Annually

Annually

Control valve(s)

Weekly/monthly

See chapter 9 NFAP 25

See chapter 9 NFPA 25

Deluge/preaction valve(s)

See chapter 9 NFPA 25

See chapter 9 NFPA 25

See chapter 9 NFPA 25

Water supply flow test

 

See chapter 4 NFPA 25

 

Detector check valve(s)

   

See chapter 9 NFPA 25

Check Valve

See chapter 9 NFPA 25

Strainer(s) – mainline

 

See chapter 7 NFPA 25

See chapter 9 NFPA 25

Detection System

See NFPA 72

See NFPA 72

See NFPA 72

Ball drip (auto type) drain valves

   

5 Years

Foam concentrate tank – drain and flush

   

10 years

Corrosion and hydro test Bladder tank type Bladder tank type

   

10 Years

Sight glass

   

10 Years

Foam concentrate tank hydro test Line Type

   

10 Years

Foam concentrate tank – corrosion and pick up pipes

   

10 Years

Foam concentrate tank – drain and flush

   

10 years

Corrosion and hydro test

   

10 Years

Sight Glass

   

10 Years

Foam Concentrate pump(s)

   

5 Years also refer to manufacturer instructions

Balancing valve diaphragm

   

5 Years

Foam concentrate tank

   

10 years

Pressure vacuum vents

   

5 Years

8-2.6.1The dependability of the water supply shall be ensured by regular inspection and maintenance, whether furnished by a municipal source, on-site storage tanks, a fire pump, or private underground piping system.

The guidelines for valves apply for all water based Fire Protection Systems according to the New Jersey Uniform Fire Code State Fire Prevention Code Effective January 2, 1999.

The guidelines for valves apply for all water based Fire Protection Systems according to the NFPA 25, Chapter 9.

VALVES, VALVE COMPONENTS, AND TRIM

Inspection

Test

Maintenance

CONTROL VALVES

   

Annually

Sealed

Weekly

   

Locked

Monthly

   

Tamper switches

Monthly

   

Position

 

Quarterly

 

Operation

 

Annually

 

Supervisory

 

Semiannually

 

ALARM VALVES

     

Exterior

Monthly

   

Interior

5 Years

   

Strainers, filters, orifices

5 Years

   

CHECK VALVES

     

Interior

5 Years

   

MAIN DRAINS

 

Annually

 

WATERFLOW ALARMS

 

Quarterly

 

PREACTION/DELUGE VALVES

     

Priming water

 

Quarterly

 

Low air pressure alarms

 

Quarterly

 

Full flow

 

Annually

 

Enclosure (during cold weather)

Daily/weekly

   

Exterior

Monthly

   

Interior

Annually

   

Strainers, filters, orifices

5 Years

   

DRY PIPE VALVES/QUICK-OPENING DEVICES

Inspection

Test

Maintenance

Enclosure (during cold weather)

Daily/weekly

   

Exterior

Monthly

   

Interior

Annually

   

Strainers, filters, orifices

5 Years

   

Priming water

 

Quarterly

 

Low air pressure alarm

 

Quarterly

 

Quick-opening devices

 

Quarterly

 

Trip test

 

Annually

 

Full flow trip test

 

3 Years

 

Pressure Reducing and Relief Valves

     

Sprinkler systems

Quarterly

Annually

 

Hose connections

Quarterly

5 Years

 

Hose racks

Quarterly

5 Years

 

Casing relief valves

Weekly

   

Circulation relief

 

Annually

 

Pressure relief valves

Weekly

Annually

 

Backflow Prevention Assemblies

 

Annually

 

Reduced Pressure

Weekly/Monthly

   

Reduced pressure detectors

Weekly/Monthly

   

Fire Department connections

Quarterly

   

Preaction/deluge Valve

   

Annually

Dry Pipe Valve/Quick-Opening Devices

   

Annually